Meeting Notes for 10 Sept

Present: Bob, TomJ, Ken, Edit

General

  • Logbook:
    • Bob will send a broadcast and update the newsbox about the update.
    • Edit will roll out new code to production on Friday.
  • ELabs hardware replacement:
    • Systems (Adam) will come up with a plan for the migration. Edit will follow up with them.
  • References, glossary and FAQs:
    • Edit will check with Liz about rolling out what has been updated already.

Cosmic

  • Blessing:
    • Tom and Bob will talk about code changes in 13 and decide on what to do next.
  • EQUIP:
    • Bob and Edit will go over how to improve the user interface based on the feedback from workshops.
  • Analysis queue:
    • This code will be on hold for the time being.
  • Cosmic data upload:
    • Edit will resend instructions on how to test this code at www13.
  • Dynamic plots:
    • We will all have a look at this test version through Google Hangouts next week. Edit will demo how this new code works.
  • Raspberry pi and EQUIP:
    • We will keep exploring the option of using the RPi for data collection.
-- Main.EditPeronja - 2014-09-10
Topic revision: r2 - 2019-05-22, AdminUser
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Foswiki? Send feedback